This plot of land was elevated & therefore needed a lot of
groundwork/excavation in order to provide access road & level plot for the
house & pool
The plot was excavated & levelled & building work started
at the beginning of 2004
Special cement pumps are able to reach even the most difficult areas.
The base & columns were constructed
The swimming pool is a special liner type & was ideal for this plot
The villa is constructed of hand-worked stone for the interior &
exterior walls which of course takes a longer time to build than the
traditional cement/steel construction
Retaining walls were stone clad to give a better appearance in keeping
with the villa
Final product !!!
There was no hurry to
build and the project was scheduled over a 2 year period.